|
ALMOARED (6%)
YCO (12.5%)
-
In
General it contains (3) fields with an average production of (3,000)
BOPD and will be increase to 10,000 BOPD in the end of year 2007.
-
The
total number of wells ware 5 until Jan. 2007.
-
The
block will be connected with the main pipeline of
block 5 (Jannah) Through Block 9.
-
The
produced is light oil in the
different fields with a density between (35-42
API), in addition to a big gas reserve, which is not
invested nor exploited so far. |